Guangxi solar street lamp
Your current location : Home >> Case >> Hot water project case

ContactContact Us

Guangxi guangtuo New Energy Technology Co., Ltd

Name:Fu Mr

Mobile:133-7715-5699

E-mail:3071737961@qq.com

Address:Room 1401, Songyu Times, 53 Baisha Avenue, Jiangnan District, Nanning

Factory:10 Xinggang Road, Xinning Town, Fusuxian County, Chongzuo city

Website:en.gxgtxny.com


Flat-panel solar water heating project for living quarters

Flat-panel solar water heating project for living quarters

  • Classification:Hot water project case
  • Number of visits:times
  • Date of Issue:2020-09-28 12:00:00
  • Case description
  • Performance characteristics
  • Technical parameters

Energy-saving hot water projects in residential areas:


In the construction of new houses, the central hot water of the community is often treated as a standing project. How to achieve high reliability, high durability and high energy saving? The focus of the residential hot water project is system control, hot water pipeline laying, and the reliability of hot water equipment.


Features of residential hot water project solution:


1. The number of households is relatively stable, and the water consumption is easy to control.


2. Mainly to ensure safety, energy saving, and sufficient hot water pressure.


3. Minimize installation cost, use cost and maintenance cost.


4. Take into account factors such as environmental protection and safety.


Parameters required for the design of residential hot water project solution:


1. Number of households?


2. Water method: bucket method (20-30Kg per person per day) / shower method (40-60Kg per person per day)


3. Do the kitchens, sinks, and washing machines use hot water? Is there a bathtub?


4. The equipment installation site (length, width, orientation, and surrounding buildings) provides the above parameters and can design the most suitable hot water project for you.


0771-3399859

Marketing Center:Guangtuo Group, Room 1401, Songyu Times, 53 Baisha Avenue, Jiangnan District, Nanning city

Production base:No. 10 xinggang Road, China ASEAN Nanning Airport Fusui Economic Zone

Website:www.gxgtxny.com


Copyright © 2020 Guangxi guangtuo New Energy Technology Co., Ltd All rights reserved 桂ICP备16001459号-4
Mainly engaged in  Guangxi photovoltaic power generation Guangxi hot water project Guangxi solar street lamp Welcome to inquire!